Green Light Given To Lake Wyangan Flood Pump And Pipeline Project
Thursday, 12 Jan 2023

The water level in Lake Wyangan has reached a record height due to continual rainfall events in 2022 and additional runoff from the catchment to the north. This has resulted in flooding of two residential houses, Jones Road causeway and associated buildings and infrastructure around the foreshore of the North Lake.
At the Extraordinary Council Meeting held on Tuesday 10 January 2023, Council resolved to divert funds from the Lake Wyangan foreshore improvements fund into a new Lake Wyangan Flood Pump and Pipeline Project. This will enable water to be pumped out of Lake Wyangan into the drainage channel along Slopes Road that eventually drains into Barren Box Storage and Wetlands system.
Griffith Deputy Mayor, Councillor Glen Andreazza said this action would allow Council to reduce the water level from around the inundated homes, the Jones Road Causeway and infrastructure on the foreshore of the North Lake.
“Given that Lake Wyangan, both North and South Lakes, are closed catchments there is no natural drainage outlet to allow any water out of the Lakes,” he said.
“After investigating suitable options, we’ve determined that the only way of extracting water is by mechanically pumping the water to another location using a new pipeline.”
On 4 August 2022 and 14 September 2022 the Griffith Local Government Area, along with numerous other Local Government Areas, was declared a disaster on the basis of severe weather and flooding. Given the emergency nature of the flooding situation and the urgent need to take action to address several issues at Lake Wyangan, the Extraordinary Council Meeting was called in order to deal with the matter.
“In late 2022 we already took steps to pump approximately 1,000 ML water into Tharbogang Wetland and water is also currently being pumped into Campbell Wetland,” Councillor Andreazza said.
“Murrumbidgee Irrigation have given permission for Council to pump water for a limited period out of Lake Wyangan up to the drain which discharges into Barren Box Swamp.
“Once water has been pumped out, Jones Road will then be assessed to determine the scope and cost of repairs with a view to resuming access to the Lake via Jones Road.
“We anticipate there will be long term benefits from installing this new infrastructure. It will enable future discharge of water from the Lake when opportunities present.”
The proposed pump will provide an output of approximately 20 ML per day when operated for 24 hours per day. Around 4,000 ML is needed to be extracted out of Lake Wyangan so it is anticipated it will take approximately six and half months of continual pumping to reduce the water level to enable Jones Road causeway to be exposed.
The total estimated cost of the pipeline project is $1.4M, which will include a new flood pump, 1.5km of high density pipe, assembly and installation, excavation and removal of the old outdated pipe and running costs.
March 2023
-
Dump For Free Event A Success
Friday, 31 Mar 2023Local residents flocked to Griffith City Council landfill sites recently, dumping more than 1,400 loads of rubbish.
Read more -
Spend Good Friday At Pioneer Park Museum’s Action Day
Friday, 31 Mar 2023Looking for something to do on Good Friday? Action Day at Griffith Pioneer Park Museum is a popular event attracting thousands of visitors and is a great family day out!
Read more -
New Destination Website For Griffith Tourism
Thursday, 30 Mar 2023The new Visit Griffith website has been unveiled inspiring potential visitors to pack their bags and head to Griffith immediately!
Read more -
Huge April School Holidays In Griffith
Thursday, 30 Mar 2023Local kids and visitors alike are in for a jam-packed few weeks these April school holidays. From April 7 - 24, with so much on offer from art workshops, roller skating, animals, and music, there is something for all ages to enjoy.
Read more -
Griffith Groove And Graze A Huge Success
Friday, 24 Mar 2023Griffith got its ‘groove’ on at Griffith’s first Groove & Graze Music Festival held on Saturday 18 March! National and local bands took to the stage in front of more than 900 attendees at the Burley Griffin Community Gardens to celebrate Griffith’s newest one-day music & food festival.
Read more -
Council Receives Two Accolades At The Ipwea Nsw & Act State Conference
Thursday, 23 Mar 2023Griffith City Council was recognised at the 2023 IPWEA NSW & ACT State Conference Engineering Excellence Awards held in Sydney last week, for two Council projects.
Read more -
Griffith City Council Launches Exciting New Youth Project
Wednesday, 22 Mar 2023Do you want to have a greater say in the events and programs being delivered for young people in Griffith? Griffith City Council is launching the exciting new ConnectYOUth2680 project to give local youth a stronger voice.
Read more -
The Wedding Singer Is On The Way!
Friday, 17 Mar 2023Rehearsals for Griffith Regional Theatre’s upcoming production of the musical The Wedding Singer have kicked off with the local cast having a wonderful time learning the songs and dances that will entertain audiences in September.
Read more -
Over $90m Worth Of Council Projects Across Griffith Lga
Thursday, 09 Mar 2023More than $90M worth of major projects are underway, recently finalised or in the planning stages across the Griffith LGA.
Read more -
Brisbane’s Globally Renowned Circa Returns To Griffith
Tuesday, 07 Mar 2023Patrons will experience an exhilarating night at the Griffith Regional Theatre on Thursday 23 March with On by Circa.
Read more -
Drop Off Pens No Longer In Use At Griffith Pound And Rehoming Centre
Friday, 03 Mar 2023 Read more